Warning: Undefined array key "HTTP_ACCEPT_ENCODING" in /var/www/html/uzcms/dig-mas.com/incs/data.php on line 133

Deprecated: strstr(): Passing null to parameter #1 ($haystack) of type string is deprecated in /var/www/html/uzcms/dig-mas.com/incs/data.php on line 133
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 / Thu, 13 Jul 2023 05:46:12 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.2 /wp-content/uploads/2017/06/favicon-150x150.jpg 威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 / 32 32 威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /gold-mine-mali-africa/ Wed, 20 Dec 2017 16:01:40 +0000 https://westpowergroup.com.au/?page_id=652 350kVA Generators for a gold mine in West Africa, no problem for WPG.

The post Gold Mine – Mali, Africa appeared first on West Power Group.

]]>

Our client required reliable diesel generators to provide prime power for their dewatering systems in the harsh conditions of landlocked Mali. The generators were supplied compliant to the end users’ requirements & specifications, also integrated with the clients pump control and SCADA systems, providing a fully automatic turn key solution.

  • Multiple 350kVA prime rated mine spec generators mounted on heavy-duty skids
  • Volvo Diesel engines
  • Meccalte Alternators
  • Deep Sea 7310 control systems
  • 380VAC output
  • External diesel cube connections
  • Solar battery charging systems
  • Lockable battery isolators
  • Factory acceptance testing
  • Assist with site commissioning
  • Mechanical & Electrical Design
  • Project management

The post Gold Mine – Mali, Africa appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /public-hospital-perth-metropolitan-western-australia/ Tue, 24 Oct 2017 11:44:10 +0000 https://westpowergroup.com.au/?page_id=413 Supply & installation of a 2,300 Litre secondary fuel system for both main steam and hot water boilers.

The post Public Hospital – Perth Metropolitan, Western Australia appeared first on West Power Group.

]]>

This project entailed 4-hour fire rated bulk diesel tanks as a secondary fuel supply for the main steam and hot water boiler systems.

The systems were installed after the plant rooms had been constructed and fitted out, installation of the equipment had to be installed using specialised rigging equipment due to spatial constraints.

  • 4-hour fire rated bulk tanks
  • Tank stands
  • Fuel transfer pipe work
  • Automatic control systems
  • Interface to the sites existing diesel fuel system
  • Transport to site for all equipment
  • On-site installation
  • Site commissioning
  • Electrical design
  • Mechanical Design
  • Project management

The post Public Hospital – Perth Metropolitan, Western Australia appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /regional-public-hospital-great-southern-western-australia/ Tue, 24 Oct 2017 11:13:56 +0000 https://westpowergroup.com.au/?page_id=398 Supply and install of a new 100kVA standby generator to an existing hospital with special consideration to minimise down time with the current system.

The post Regional Public Hospital – Great Southern, Western Australia appeared first on West Power Group.

]]>

390km South West of Perth, WPG successfully won the tender for supply and commissioning of a 100kVA acoustic weather proof generator. Integration with the main switch board was coordinated with the client’s electrical contractor to perform automatic start in the event of a mains power outage.

As an existing operational hospital, minable down time was critical for the changeover to the new system.

  • 100kVA Standby generator
  • IVECO FPT Diesel engine
  • Meccalte alternator
  • Deep Sea 7320 control system
  • Factory acceptance testing
  • Transport to site including offloading
  • Site acceptance testing
  • Site acceptance witness testing
  • Electrical design
  • Site management
  • Project management

The post Regional Public Hospital – Great Southern, Western Australia appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /private-hospital-perth-metropolitan-western-australia/ Mon, 23 Oct 2017 05:23:33 +0000 https://westpowergroup.com.au/?page_id=390 Upgrade to a new 720kVA standby generator, with decommission and disposal of existing 400kVA set.

The post Private Hospital – Perth Metropolitan, Western Australia appeared first on West Power Group.

]]>

Our client required an upgrade to a new 720kVA standby generator, with removal and disposal of the existing 400kVA generator set from the second floor in an existing section of the hospital. Reconnection to the sites existing fuel transfer system and wiring into the mains supply was an installation specification, with works being staged to prevent minable downtime time with the current system.

  • 720kVA Standby generator complete with an acoustic weather proof canopy
  • MTU Series 1600 Diesel engine
  • Meccalte Alternator
  • Deep Sea 7230 control system
  • Integrated fuel control system
  • Fuel transfer pipe work installation
  • Factory acceptance testing
  • Transport to site
  • Craning the generator into position
  • Site acceptance testing
  • Site acceptance witness testing
  • Mechanical design
  • Electrical design
  • Site management
  • Project management

The post Private Hospital – Perth Metropolitan, Western Australia appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /major-busport-perth-city/ Mon, 23 Oct 2017 05:15:06 +0000 https://westpowergroup.com.au/?page_id=375 Supply, install & commissioning a 900kVA Standby generator complete with an acoustic weather proof canopy and auto fuel system.

The post Major Busport – Perth City appeared first on West Power Group.

]]>

A complete turnkey solution from initial client connection through to final commissioning. WPG facilitated a 900kVA standby generator, 1600amp automatic transfer switch, 5000 Litre bulk fuel tank, fuel transfer system and 45 meters of insulated exhaust. Decommissioning and removal of the obsolete 100kVA was included in the scope of works.

Logistics to site, installation of both mechanical and electrical equipment was performed. The site being operational, the works were staged to prevent minimal down time once the new system was installed.

  • 900kVA Standby generator complete with an acoustic weather proof canopy
  • Perkins Diesel engine
  • Meccalte Alternator
  • Deep Sea 7320 control system
  • Custom manufactured Stainless Steel engine silencer
  • 5000 Litre double contained diesel bulk tank
  • Duty/Standby diesel transfer pump system
  • PLC based fuel control system complete with touch screen HMI
  • Complete diesel fuel transfer pipe work installation
  • 45Lm Site installation of engine exhaust system with thermal insulation and aluminium hard cladding
  • Factory acceptance testing
  • Transport to site
  • Craning the generator into position
  • Site acceptance testing
  • Site fill of diesel fuel
  • Site acceptance witness testing
  • Mechanical design
  • Electrical design
  • Site management
  • Traffic management
  • Project management

The post Major Busport – Perth City appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /major-airport-pilbara-western-australia/ Mon, 23 Oct 2017 04:55:17 +0000 https://westpowergroup.com.au/?page_id=351 Located in the remote Pilbara region WPG supplied, installed and commissioned two complete 810kVA diesel generator systems for standby power.

The post Major Airport – Pilbara, Western Australia appeared first on West Power Group.

]]>

West Power Group was awarded this project to supply a turnkey solution; comprising two synchronising 810kVA Diesel driven generators, 10,000L bulk fuel tank system with an automatic transfer control to the generator base tank. Fully compliant remote mimic controls within the site’s main switch board, to the end users requirements and specifications including integration to the site BMS.

WPG managed the logistics to site, including installation of both mechanical and electrical components.

  • Two 810kVA Standby generator complete with an acoustic weather proof canopy
  • Perkins Diesel engine
  • Meccalte Alternator (compliant with airport regulations)
  • ComAp InteliSys synchronising control system
  • Synchronising and load sharing control
  • 10,000 Litre double contained diesel bulk tank
  • Duty/Standby diesel transfer pumps system
  • Fuel control system complete
  • Complete diesel fuel transfer pipe work installation
  • Comprehensive generator factory acceptance testing
  • Comprehensive main switchboard factory acceptance testing
  • Transport to site for all components
  • Craning the generators into position
  • Site installation
  • Site acceptance testing
  • Site acceptance witness testing
  • Mechanical design
  • Electrical design
  • Site management
  • Project management

The post Major Airport – Pilbara, Western Australia appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /iron-ore-mine-midwest-western-australia/ Mon, 23 Oct 2017 04:19:01 +0000 https://westpowergroup.com.au/?page_id=341 In the heart of WA’s Midwest region, West Power Group partnered with one of Australia leading pump companies to deploy a series of prime rated mine spec generators systems.

The post Iron Ore Mine – Midwest, Western Australia appeared first on West Power Group.

]]>

West Power Group supplied and commissioned a series of 100kVA & 200kVA diesel generators to this Midwest Iron Ore mine, mounted on heavy duty skids. Supplying a reliable source of prime power to our clients’ submersible dewatering pumps and SCADA system, was key to this projects success.

  • 100kVA & 200kVA prime rated mine spec generators powered by Perkins & Volvo engines mounted on heavy-duty skids
  • Meccalte alternators
  • Deep Sea 7310 control systems
  • Lockable battery isolators
  • Marechal power outlets
  • External coms connections
  • Factory acceptance testing
  • Site commissioning
  • Electrical design
  • Mechanical Design
  • Project management

The post Iron Ore Mine – Midwest, Western Australia appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /major-airport-perth-australia/ Mon, 23 Oct 2017 03:15:45 +0000 https://westpowergroup.com.au/?page_id=330 WPG was awarded this prestigious project facilitating the supply & installation of multiple 550kVA generator systems for a major Perth airport.

The post Major Airport – Perth, Australia appeared first on West Power Group.

]]>

New facilities onsite were constructed to upgrade the Instrument Landing System to approach category III. Vital for the upgrade to a Cat. III rating, a reliable source of power was necessary. Located at multiple locations, each 550kVA generator is on standby to automatically power up the runway lighting system controls. Each generator system is supported by a 5000 Litre bulk diesel tank with integral transfer pumps and controls.

  • Multiple 550kVA Standby generators complete with acoustic weather proof canopies
  • Volvo Diesel engines
  • Meccalte Alternators
  • Deep Sea 7320 controls systems
  • Woodward easYgen control systems synchronised with the mains power to provide bumpless transfer as well as soft loading and unloading
  • Stainless Steel engine exhausts with thermal insulation
  • 5000 Litre double contained diesel bulk tanks
  • Duty/Standby diesel transfer pump systems
  • PLC based fuel control system complete with touch screen HMI
  • Complete diesel fuel transfer pipe work installation
  • Double contained diesel transfer pipe work
  • Factory acceptance testing
  • Transport to site
  • Craning the generators into position
  • Site acceptance testing
  • Site acceptance witness testing
  • Mechanical design
  • Electrical design
  • Site management
  • Project management

The post Major Airport – Perth, Australia appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /government-department-offices-perth-city-western-australia/ Mon, 23 Oct 2017 03:08:00 +0000 https://westpowergroup.com.au/?page_id=321 415kVA standby generator supply and installation, with integral 24 hour run time diesel base tank.

The post Government Department Offices – Perth City, Western Australia appeared first on West Power Group.

]]>

In the heart of Perth City, our client tendered a high-end quality standby diesel powered generator, ready to provide backup power to over 10 floors of office space. Working in conjunction with the electrical contractor, WPG supplied and installed a 415kVA generator to our client’s requirements, with special consideration to deliver minable down time with the changeover of systems. The generator is integrated with the main switchboard to perform automatic start on mains power failure, with an integral 24 hour run time, diesel base tank.

  • 415kVA Standby generator complete with an acoustic weather proof canopy
  • Volvo Diesel engine
  • Meccalte Alternator
  • Deep Sea 7320 control system
  • Factory acceptance testing
  • Logistics to site and final positioning
  • Site acceptance testing
  • Site fuelling
  • Site acceptance witness testing

The post Government Department Offices – Perth City, Western Australia appeared first on West Power Group.

]]>
威尼斯87978797老品牌|主页%87978797威尼斯|主頁_welcome%威尼斯144777欢迎您|主頁_welcome%威尼斯城vnsc|主頁_welcome%88038威尼斯|首页 /gold-mine-midwest-western-australia/ Mon, 23 Oct 2017 02:25:43 +0000 https://westpowergroup.com.au/?page_id=313 Multiple diesel generators ranging from 20kVA to 100kVA, each with an external fuel cube for extended run times were supplied and commissioned by our team at WPG.

The post Gold Mine – Midwest, Western Australia appeared first on West Power Group.

]]>

West Power Group supplied and commissioned a series of 20kVA, 30kVA, 60kVA and 100kVA diesel generators to this Midwest Gold Mine, each with an external fuel cube for extended run times. Supplying a reliable source of prime power to our clients’ bore systems and transfer stations was key to this projects success. Integration with the sites’ wireless Miri SCADA system was a requirement; along with multiple generators operating in parallel providing precise loading for different pump sequencing programs.

  • Multiple 20kVA, 30kVA, 60kVA and 100kVA prime rated mine spec diesel driven generators, each with external fuel cubes with integral selector valves for extended run times
  • Kohler, Iveco and Volvo Diesel engines
  • Meccalte Alternators
  • Deep Sea 7310 control systems
  • Solar battery charging systems
  • Lockable battery isolators
  • External quick connect fuel cube connections
  • Specialised synchronising control systems
  • Factory acceptance testing
  • Site commissioning
  • Electrical design
  • Site management
  • Project management

The post Gold Mine – Midwest, Western Australia appeared first on West Power Group.

]]>